Toggle menu

Marine Safety Management System - Risk Assessments

Introduction

The Port of Bideford Port and Navigational Risk Assessment document has been compiled to formally identify all the marine hazards within the jurisdiction of the Port.  As a part of the Safety Management System, a full assessment of the hazards has been carried out against a standard of acceptability.  Where appropriate, risk reducing control measures have been put in place to eliminate or reduce the risk to as low as reasonably practicable (ALARP).  As with any Safety Management System, there needs to be a robust and regular monitoring and review system in place to fully support the validity of the Navigation Risk Assessment.

For the purposes of this document the definition of "hazard" and "risk" are defined below.

  • "Hazard": A potential source of harm, loss or injury.

  • "Risk": The probability of suffering harm or loss and is a measure of the frequency and consequence of a particular hazard.

If you have any questions about this document please email harbour.master@torridge.gov.uk or telephone 01237 475834.

Port of Bideford Risk Assessment Process (PDF) [230KB]   Port of Bideford MRA 6 - Crane Operations on the Town Quay V1 (PDF) [192KB]  
Port of Bideford MRA 1 - Slips Trips and Falls V3 - Dated Mar 24 (PDF) [215KB]   Port of Bideford MRA 7 - Pilot Boarding and Landing V1 (PDF) [213KB]  
Port of Bideford MRA 2 - Pilotage V1 (PDF) [211KB]   Port of Bideford MRA 8 - Appledore Fish Quay V1 (PDF) [264KB]  
Port of Bideford MRA 3 - MV Oldenburg V1 (PDF) [208KB]   Port of Bideford MRA 9 - Cargo Operations on the Town Quay V1 (PDF) [192KB]  
Port of Bideford MRA 4 - Oil Spills V1 (PDF) [200KB]   Port of Bideford MRA 10 - COVID Precautions V1 (PDF) [194KB]  
Port of Bideford MRA 5 - Vessel Breaks Moorings V1 (PDF) [195KB]    
    
    
    
    

 

 

Share this page

Share on Facebook Share on Twitter Share by email