Documents
-
Annual Monitoring Report (AMR)
The Annual Monitoring Report (AMR) is an important part of the Local Plan system as part of a Plan, Monitor and Manage approach.
-
Strategic Environmental Assessment and Sustainability Appraisal
Strategic Environmental Assessment (SEA) has been introduced to the UK through the EU Directive 2001 / 42 / EC, and in England the Directive has been implemented via the Environmental Assessment of Plans and Programmes Regulations 2004. SEA is a systematic process for the evaluation of the likely environmental consequences of proposed policies, plans or programmes in order to ensure that environmental issues are fully integrated and assessed at the earliest appropriate stage of decision making.
-
Joint Landscape Character Assessment for North Devon and Torridge Districts
-
Landscape Sensitivity Assessment for Torridge District
An Assessment of the Landscape Sensitivity to Onshore Wind Energy & Field-Scale Photovoltaic Development in Torridge District
-
North Devon and Torridge Retail and Leisure Needs Assessment
An assessment of North Devon and Torridge retail and leisure needs.